{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009218,"name":"FRA","dataset":"planning-condition","typology":"policy","reference":"U0121871","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants in accordance with Policy 56.","description":"The development shall be carried out in accordance with the submitted flood risk assessment (Reference: 6262, dated 17/05/2021, produced by Ambiental Environmental Assessment) and the following mitigation measures it details: o Ground floor use to be limited to garages and utility rooms. o Flood resilience measures as referenced in section 7.6 to be incorporated into the construction. o Finished floor levels for habitable accommodation shall be set no lower than 5.00 metres above Ordnance Datum (mAOD) These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}