{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009251,"name":"FRA Compliance","dataset":"planning-condition","typology":"policy","reference":"U0122059","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants and to prevent flooding elsewhere by ensuring that flood storage is not negatively impacted.","description":"The development shall be carried out in accordance with the submitted flood risk assessment by Harrison Pick Ltd dated 26 March 2024, and the following mitigation measures it details: - Finished floor levels shall be set no lower than 2.66 metres above Ordnance Datum (mAOD). - The shed shall be of an open construction and have an open-door policy to allow flood waters to pass though unimpeded. - Flood resistance and resilience measures shall be incorporated so that electrical or other flood sensitive equipment shall be set no lower than 4.40m AOD. These mitigation measures shall be fully implemented prior to the first use of the building. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}