{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009350,"name":"FRA Compliance","dataset":"planning-condition","typology":"policy","reference":"U0122482","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants and to prevent flooding elsewhere by ensuring that compensatory storage of flood water is provided.","description":"The development shall be carried out in accordance with the submitted flood risk assessment (ref 23486-FRA-001 / Rev B / Received 30/04/2024 / D) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 5 metres above Ordnance Datum (AOD); - Compensatory storage shall be provided and maintained as detailed within Section 3 and Appendix D of the submitted FRA; and - Flood resistance and resilience measures shall be incorporated into the development as detailed within the submitted FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}