{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009386,"name":"Approved Plans","dataset":"planning-condition","typology":"policy","reference":"U0122691","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Location Plan and Site Plan. Drawing number: 104. Date received: 10/01/2024. Proposed Elevations. Drawing number: 103. Revision: B. Date received: 28/05/2024. Proposed Floor Plans. Drawing number: 102. Revision: B. Date received: 31/05/2024. Rooflight Details (rafters). Drawing number: 106. Revision: A. Date received: 24/05/2024. Sections (A-A and B-B). Drawing number: 104. Revision: A. Date received: 24/04/2024. Sections (Unit 2 as proposed). Drawing number: 107. Date received: 24/05/2024. Sections (Unit 2 as existing). Drawing number: 107. Revision: A. Date received: 31/05/2024."}