{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009420,"name":"plans","dataset":"planning-condition","typology":"policy","reference":"U0122852","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan, received 08.10.2019 Drainage Plan (85/19/Y15-07a), received 30.07.2020 Floor Plan (8519Y15-01d), received 22.04.2024 Elevations (85/19/Y15-01e), received 21.03.2024 Site Plan (85/19/Y15-08b), received 21.03.2024 Landscape Plan (85/19/Y15-05b), received 22.04.2024"}