{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009434,"name":"Methodology and agreed works","dataset":"planning-condition","typology":"policy","reference":"U0122974","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To preserve the character and appearance of the conservation area in accordance with policy 37 of the Doncaster Local Plan.","description":"Prior to the commencement of any further site works, a statement shall be submitted to and agreed by the Local Planning Authority that includes the methodology and extent of any controlled demolition. The statement must also indicate temporary methods of support that may be required in order to retain the remaining structure. The work shall be carried out in accordance with the agreed statement. Once the works included in the statement have been undertaken, a further scheme of works shall be submitted to the Local Planning Authority and agreed for those parts of the structure that can be repaired and retained together with the details of construction of the parts that shall be re-built. The statement shall include; - The extent and location of any underpinning that might be required, - The extent and method of stabilising masonry where required, - Details of reclaimed materials to be used and samples of any replacement/additional stone where required, - A specification and method statement for any re pointing required, - A scheme for the reinstatement of the roof (including whether any historic timbers can be incorporated), - Details of the coping treatment of the gables The submitted scheme shall include the methodology of construction and materials that shall be used. The work shall be carried out in accordance with the agreed scheme."}