{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009437,"name":"Bat boxes","dataset":"planning-condition","typology":"policy","reference":"U0122977","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In line with policy 30 of the Doncaster Local Plan.Core Strategy to ensure the ongoing ecological interests of the site with respect to bats.","description":"Two integrated bat boxes as described in section 10.1.2 of the Bat Activity Survey Report dated June 6th 2019 and submitted with this application shall be installed in the converted barn within 12 months of occupation, unless agreed otherwise in writing by the Local Planning Authority."}