[{"fact":"6fce8ce6862b65913eb5b031c40a402eeb6e3e24d146ca3bef6523aefcbc6caa","entity":73001007,"reference-entity":"","field":"description","value":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan, drawing no. FA-DR-03-101, Revision P2 - Proposed Site Plan, drawing no. FA-DR-03-103 - GA_Elevations_Overall-Proposed, drawing no. FA-DR-03-210, Revision P2 - GA_Plans&Elevations_Proposed, drawing no. FA-DR-03-215, Revision P4 - Design and Access Statement, March 2023","entity-name":"in accordance with specified plans","entity-prefix":"planning-condition","entity-reference":"U0112062","earliest-entry-date":"2025-03-20","latest-entry-date":"2025-03-20","latest-resource":"6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c","resources":""}]