[{"fact":"5144bf811c3c88f8595c71bd5af53a04367aa33404a1346e55e42fc5bce43905","entity":73001058,"reference-entity":"","field":"description","value":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan: Drawing No. 01 as received 12/06/2023 Proposed Floor Plans (Ground Floor): Drawing No. 02 (Revision A) as received 08/08/2023 Proposed Floor Plans (First Floor): Drawing No. 04 (Revision A) as received 08/08/2023 Proposed Elevations (Includes Site Plan): Drawing No. 03 (Revision A) as received 08/08/2023 Sections: Drawing No. 05 (Revision A) as received 08/08/2023","entity-name":"In accordance with plans specified","entity-prefix":"planning-condition","entity-reference":"U0112261","earliest-entry-date":"2025-03-20","latest-entry-date":"2025-03-20","latest-resource":"6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c","resources":""}]