[{"fact":"765b700a2f5e4f8e8d45762fa6c34c4726ef87a4f86bcb7dd83466498875c45d","entity":73001155,"reference-entity":"","field":"description","value":"The development shall be carried out in accordance with the submitted flood risk assessment by Arup referenced ADW01-ARP-XX-XX-RP-C-1001 FRA and dated 13 March 2023, and the following mitigation measures it details: o Finished floor levels for the chemical dosing kiosk shall be set no lower than 7.5 metres above Ordnance Datum (mAOD) o Finished floor levels for the MCC kiosk shall be set no lower than 6.535 metres above Ordnance Datum (mAOD) These mitigation measures shall be fully implemented prior to use. . The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.","entity-name":"ea","entity-prefix":"planning-condition","entity-reference":"U0112652","earliest-entry-date":"2025-03-20","latest-entry-date":"2025-03-20","latest-resource":"6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c","resources":""}]