[{"fact":"9980ea89a0b1ce739e9abaef5733c507a4e000dfa90cb186aaa7df2923ce070d","entity":73001214,"reference-entity":"","field":"description","value":"No development shall take place until details of the proposed means of disposal of foul water drainage for the whole site, including details of any balancing works, off-site works and phasing of the necessary infrastructure, have been submitted to and approved by the local planning authority. If sewage pumping is required from any part of the site, the peak pumped foul water discharge must not exceed 4.75 (four point seven five) litres per second. Furthermore, unless otherwise approved in writing by the local planning authority, no buildings shall be occupied or brought into use prior to completion of the approved foul drainage works.","entity-name":"drainage -foul- YW","entity-prefix":"planning-condition","entity-reference":"U0112956","earliest-entry-date":"2025-03-20","latest-entry-date":"2025-03-20","latest-resource":"6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c","resources":""}]