[{"fact":"779a88e413390000d6b61dbd540ea0ff58fe6105ed7699c88d743f424d8f68ee","entity":73001261,"reference-entity":"","field":"description","value":"All surface water run off from the site, excepting roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor. These arrangements shall be implemented according to details listed below and as approved by the Local Planning Authority under reference 23/00523/COND and they shall be fully operational before the site is brought into use. - Drainage Plan, 13664-077-33-A - Surface Water Strategy Report (Marks Heeley Ltd, ref. H16601), April 2023 - Finishes Plan, 13664-077-46","entity-name":"Surface water via interceptor (amended)","entity-prefix":"planning-condition","entity-reference":"U0113229","earliest-entry-date":"2025-03-20","latest-entry-date":"2025-03-20","latest-resource":"6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c","resources":""}]