[{"fact":"7b5351c968f77292a5caecb8a37e496c2edef461b4a9cbe2a9bac5b2aa13a0e4","entity":73001262,"reference-entity":"","field":"description","value":"Any water run off from the vehicle wash down area shall be discharged to the public foul sewer (in accordance with PPG13-Vehicle washing and cleaning) via a suitable oil/ petrol/grit interceptor. These arrangements shall be implemented according to details listed below and as approved by the Local Planning Authority under reference 23/00523/COND and they shall be fully operational before the site is brought into use. - Drainage Plan, 13664-077-33-A - Surface Water Strategy Report (Marks Heeley Ltd, ref. H16601), April 2023 - Finishes Plan, 13664-077-46","entity-name":"Vehicle wash run off (amended)","entity-prefix":"planning-condition","entity-reference":"U0113230","earliest-entry-date":"2025-03-20","latest-entry-date":"2025-03-20","latest-resource":"6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c","resources":""}]