[{"fact":"d537def3db8a58c61cd45b122c3e2c78d36247e114a90f2bcaff905cce6952ce","entity":73001437,"reference-entity":"","field":"description","value":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Plans (Including Location and Site Plans) - Drawing No. 02, Revision 02, as received 05/10/2023 Proposed Plans (Including Section and First Floor) - Drawing No. 03, Revision 02 as received 19/07/2023","entity-name":"In accordance with plans specified","entity-prefix":"planning-condition","entity-reference":"U0113912","earliest-entry-date":"2025-03-20","latest-entry-date":"2025-03-20","latest-resource":"6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c","resources":""}]