[{"fact":"5f116f642859988a543453e79e28649e6da8a262dbcaf8bb114a9f0a10b89c80","entity":73001479,"reference-entity":"","field":"description","value":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Proposed floor plans including site and location plan. Drawing number: 01. Revision 02. Date received: 27/09/2023. Proposed elevations. Drawing number: 03. Revision: 01. Date received: 27/09/2023. Timber Boarding. Date received: 04/09/2023.","entity-name":"Approved Plans","entity-prefix":"planning-condition","entity-reference":"U0114117","earliest-entry-date":"2025-03-20","latest-entry-date":"2025-03-20","latest-resource":"6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c","resources":""}]