[{"fact":"72ab76491cf3c3e1386abf7d89475b6cdab132c911e0620ed4ffdb107745ac7d","entity":73001574,"reference-entity":"","field":"description","value":"The development shall be carried out in accordance with the submitted flood risk statement compiled by Building Link Design Architects (13/09/23) and the following mitigation measures it details: - Finished Floor levels of the ground floor will be no lower than 2.88 meters above Ordinance Datum (mAOD); - There shall be no sleeping accommodation located on the ground floor of the development; - Flood resilience measures will be incorporated up to a minimum of 4.4 mAOD; and - Electrical sockets will be raised to a minimum of 4.4 mAOD. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.","entity-name":"FRA Compliance","entity-prefix":"planning-condition","entity-reference":"U0114605","earliest-entry-date":"2025-03-20","latest-entry-date":"2025-03-20","latest-resource":"6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c","resources":""}]