[{"fact":"ce9589f6227961e3e2bc060eb3c383cf26f84c002eb1d7334bf65b2fb2e709c2","entity":73001603,"reference-entity":"","field":"description","value":"The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Location Plan and Site Plan. Drawing number: 20-005-LP01. Date received: 18/05/2023. Proposed Site Plan. Drawing number: 23/005-P07. Revision 'E'. Date received: 16/10/2023. Proposed Ground Floor Plan. Drawing number: 23-005-DEMO1. Revision 'C'. Date received: 30/08/2023. Proposed First Floor. Drawing number: 23-005-P09. Revision 'B'. Date received: 23/07/2023. Proposed First Floor Demolition. Drawing number: 23-005-DEMO2. Revision 'B'. Date received: 23/07/2023. Proposed Second Floor. Drawing number: 23-005-P10. Revision 'B'. Date received: 23/07/2023. Proposed Second Floor Demolition. Drawing number: 23-005-DEMO3. Revision 'B'. Date received: 23/07/2023. Proposed Front and East Side Elevations. Drawing number: 23-005-P11. Revision 'A'. Date received: 25/07/2023. Proposed Rear and East Side Elevations. Drawing number: 23-005-P12. Revision 'B'. Date received: 16/10/2023.","entity-name":"Approved Plans","entity-prefix":"planning-condition","entity-reference":"U0114769","earliest-entry-date":"2025-03-20","latest-entry-date":"2025-03-20","latest-resource":"6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c","resources":""}]