[{"fact":"17e4b33fdf66fddd17da33711c1b272b2482c5346187014c1ec6bcf9313dd13a","entity":73001798,"reference-entity":"","field":"description","value":"Prior to the occupation of the development hereby approved, details of electric vehicle charging provision shall be submitted to and approved in writing by the local planning authority. Installation shall comply with Appendix 2 of the Doncaster Local Plan 2015-2035 (2021). The first dwelling shall not be occupied until the approved connections have been installed and are operational. Electric vehicle charging connections shall thereafter be retained for the lifetime of the development. The development shall be carried out in accordance with the approved details.","entity-name":"EV Charging","entity-prefix":"planning-condition","entity-reference":"U0115708","earliest-entry-date":"2025-03-20","latest-entry-date":"2025-03-20","latest-resource":"6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c","resources":""}]