[{"fact":"8a74bd04d79e59a19199051f2a7f71b4d19a3d75be9ba69e36174a1cfc8a9d58","entity":73001894,"reference-entity":"","field":"description","value":"The development shall be carried out in accordance with the submitted flood risk assessment (ref Flood Risk Assessment Report / rec'd July 2023) and the following mitigation measures it details: o Finished floor levels shall be set no lower than existing levels at ground and upper floors, as per Pg11: Recommendations of the FRA o More vulnerable (residential) development will be limited to the first floor and above, as per Pg11: Recommendations of the FRA o Flood resilience and resistance measures shall be included as per Pg11: Recommendations of the FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.","entity-name":"Flood risk","entity-prefix":"planning-condition","entity-reference":"U0116046","earliest-entry-date":"2025-03-20","latest-entry-date":"2025-03-20","latest-resource":"6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c","resources":""}]