[{"fact":"15715f2bfd66f299357c74dcc02ab83819cda16a6dc2d0e34a279fc930fbb9ca","entity":73002118,"reference-entity":"","field":"description","value":"The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Location Plan received 11.10.23 DGW1-BBA-Z1-00-DR-A-2001 Proposed Ground Floor GA Plan P11 received 11.10.23 DGW1-BBA-Z1-01-DR-A-2001 Proposed First Floor GA Plan P11 received 11.10.23 DGW1-BBA-Z1-02-DR-A-2001 Proposed Second Floor GA Plan P11 received 11.10.23 DGW1-BBA-Z1-03-DR-A-2001 Proposed Third Floor GA Plan P11 received 11.10.23 DGW1-BBA-Z1-04-DR-A-2001 Proposed Fourth Floor GA Plan P11 received 11.10.23 DGW1-BBA-Z1-05-DR-A-2001 Proposed Fifth Floor GA Plan P13 received 11.10.23 DGW1-BBA-Z1-RF-DR-A-2001 Proposed Roof GA Plan P11 received 11.10.23 DGW1-BBA-Z1-ZZ-DR-A-3001 GA Elevations Sheet 1 P08 received 11.10.23 DGW1-BBA-Z1-ZZ-DR-A-3002 GA Elevations Sheet 2 P09 received 11.10.23 DGW1-BBA-Z1-ZZ-DR-A-3003 GA Elevations Sheet 3 P09 received 11.10.23 DGW1-BBA-XX-XX-SH-L-0001 - LANDSCAPE MATERIALS & ELEMENTS PALETTE & OUTLINE SPECIFICATION - P03 received 30.11.23 DGW1-BBA-Z0-SL-DR-L-1003 P11 Landscape GA Plan - received 8.12.23 DGW1-BBA-Z0-SL-DR-L-1004 P09 Soft Landscape Strategy Plan - received 8.12.23 DGW1-BBA-Z0-SL-DR-L-1007 P02 Hardworks Plan - received 29.11.23 DGW1-BBA-Z0-SL-DR-L-1008 P02 Planting Plan - received 29.11.23 DGW1-BBA-ZZ-SL-DR-L-7004 P04 External Furniture Details - received 29.11.23 DGW1-BBA-ZZ-SL-DR-L-7005 P01 Fencing Details - received 29.11.23 DGW1-BBA-ZZ-SL-DR-L-7007 P02 Landscape Interface Detail 02 - received 29.11.23","entity-name":"Plans","entity-prefix":"planning-condition","entity-reference":"U0117177","earliest-entry-date":"2025-03-20","latest-entry-date":"2025-06-24","latest-resource":"cddbf6b3b9eea723b5249c68a38910c2e0b5179b9d93e006eb17572584b10bdc","resources":""}]