Planning condition
Renewables
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0110256 | no fact link |
| Prefix | planning-condition | Facts about Prefix |
| Reference | U0110256 | Facts about Reference |
| Name | Renewables | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts about Start date | |
| End date | Facts about End date | |
| Entry date | 2025-03-20 | Facts about Entry date |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts about Notes |
| Reason | In the interests of sustainability and to minimize the impact of the development on the effects of climate change. This condition is required to be discharged prior to commencement as the approved detail may have an impact on the design and fabric of the building during construction or the appearance of the development. | Facts about Reason |
| Description | No development shall commence on site until a report (the initial SAP report carried out as part of Building Regulations will be sufficient information in many cases) has been submitted to the local planning authority and approved in writing from them, explaining how CO2 emissions from the development will be reduced by providing at least 10 Percent of the development's energy through on-site renewable energy equipment or improvements to the fabric efficiency of the building. The carbon savings, which result from proposed measures, will be above and beyond what is required to comply with Part L of Building Regulations. Unless otherwise agreed in writing by the Local Planning Authority, the development shall then proceed in accordance with the approved report. Before any building is occupied or sold, the local planning authority shall be satisfied that the measures have been installed, which will enable the planning condition to be fully discharged. | Facts about Description |
Contents
{
"entry-date": "2025-03-20",
"start-date": "",
"end-date": "",
"entity": 73000602,
"name": "Renewables",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0110256",
"prefix": "planning-condition",
"organisation-entity": 109,
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "In the interests of sustainability and to minimize the impact of the development on the effects of climate change. This condition is required to be discharged prior to commencement as the approved detail may have an impact on the design and fabric of the building during construction or the appearance of the development.",
"description": "No development shall commence on site until a report (the initial SAP report carried out as part of Building Regulations will be sufficient information in many cases) has been submitted to the local planning authority and approved in writing from them, explaining how CO2 emissions from the development will be reduced by providing at least 10 Percent of the development's energy through on-site renewable energy equipment or improvements to the fabric efficiency of the building. The carbon savings, which result from proposed measures, will be above and beyond what is required to comply with Part L of Building Regulations. Unless otherwise agreed in writing by the Local Planning Authority, the development shall then proceed in accordance with the approved report. Before any building is occupied or sold, the local planning authority shall be satisfied that the measures have been installed, which will enable the planning condition to be fully discharged."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.