Planning condition
Y Water
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0110425 | no fact link |
| Prefix | planning-condition | Facts about Prefix |
| Reference | U0110425 | Facts about Reference |
| Name | Y Water | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts about Start date | |
| End date | Facts about End date | |
| Entry date | 2025-03-20 | Facts about Entry date |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts about Notes |
| Reason | In the interest of public health and maintaining the public sewer network | Facts about Reason |
| Description | In the instance of the 300mm public combined sewer, no building or other obstruction including landscape features shall be located over or within 3 metres either side of the centre line of the public sewer i.e. a protected strip width of 6 metres, that crosses the site. Furthermore, no construction works in the relevant area(s) of the site shall commence until measures to protect the public sewerage infrastructure that is laid within the site boundary have been implemented in full accordance with details that have been submitted to and approved by the Local Planning Authority. The details shall include but not be exclusive to the means of ensuring that access to the pipe for the purposes of repair and maintenance by the statutory undertaker shall be retained at all times. If the required stand-off or protection measures are to be achieved via diversion or closure of the sewer, the developer shall submit evidence to the Local Planning Authority that the diversion or closure has been agreed with the relevant statutory undertaker and that, prior to construction in the affected area, the approved works have been undertaken. | Facts about Description |
Contents
{
"entry-date": "2025-03-20",
"start-date": "",
"end-date": "",
"entity": 73000652,
"name": "Y Water",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0110425",
"prefix": "planning-condition",
"organisation-entity": 109,
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "In the interest of public health and maintaining the public sewer network",
"description": "In the instance of the 300mm public combined sewer, no building or other obstruction including landscape features shall be located over or within 3 metres either side of the centre line of the public sewer i.e. a protected strip width of 6 metres, that crosses the site. Furthermore, no construction works in the relevant area(s) of the site shall commence until measures to protect the public sewerage infrastructure that is laid within the site boundary have been implemented in full accordance with details that have been submitted to and approved by the Local Planning Authority. The details shall include but not be exclusive to the means of ensuring that access to the pipe for the purposes of repair and maintenance by the statutory undertaker shall be retained at all times. If the required stand-off or protection measures are to be achieved via diversion or closure of the sewer, the developer shall submit evidence to the Local Planning Authority that the diversion or closure has been agreed with the relevant statutory undertaker and that, prior to construction in the affected area, the approved works have been undertaken."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.