Planning condition
CTMP
| Field | Value | Fact links |
|---|---|---|
| CURIE | planning-condition:U0112152 | no fact link |
| Prefix | planning-condition | Facts |
| Reference | U0112152 | Facts |
| Name | CTMP | Facts |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts | |
| End date | Facts | |
| Entry date | 2025-03-20 | Facts |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts |
| Reason | In the interests of road safety in accordance with Local Plan Policy 13. | Facts |
| Description | Development shall not commence until Construction Traffic Management Plan (CTMP) for that phase of development is submitted to and subsequently approved in writing by the Local Highway Authority. The approved plan shall be adhered to throughout the construction phase. I would expect the CTMP to contain information relating to (but not limited to): o Volumes and types of construction vehicles o identification of delivery routes; o identification of agreed access point o Contractors method for controlling construction traffic and adherence to routes o Size, route and numbers of abnormal loads o Swept path analysis (as required) o Construction Period o Temporary signage o Measures to control mud and dust being transferred to the public highway o Timing of deliveries | Facts |
Contents
{
"curie": "planning-condition:U0112152",
"prefix": "planning-condition",
"reference": "U0112152",
"name": "CTMP",
"dataset": "planning-condition",
"organisation-entity": "local-authority:DNC",
"start-date": "",
"end-date": "",
"entry-date": "2025-03-20",
"typology": "policy",
"geometry": "",
"point": "",
"entity": 73001023,
"quality": "",
"notes": "Unique Condition",
"reason": "In the interests of road safety in accordance with Local Plan Policy 13.",
"description": "Development shall not commence until Construction Traffic Management Plan (CTMP) for that phase of development is submitted to and subsequently approved in writing by the Local Highway Authority. The approved plan shall be adhered to throughout the construction phase. I would expect the CTMP to contain information relating to (but not limited to): o Volumes and types of construction vehicles o identification of delivery routes; o identification of agreed access point o Contractors method for controlling construction traffic and adherence to routes o Size, route and numbers of abnormal loads o Swept path analysis (as required) o Construction Period o Temporary signage o Measures to control mud and dust being transferred to the public highway o Timing of deliveries"
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.