Skip to main content

This is a new service - your feedback will help us to improve it.

Planning condition

Surface water via interceptor (amended)

Field Value Fact links
CURIE planning-condition:U0113229 no fact link
Prefix planning-condition Facts
Reference U0113229 Facts
Name Surface water via interceptor (amended) Facts
Quality We have no data no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts
End date Facts
Entry date 2025-03-20 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason To avoid pollution of the public sewer and land drainage system. Facts
Description All surface water run off from the site, excepting roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor. These arrangements shall be implemented according to details listed below and as approved by the Local Planning Authority under reference 23/00523/COND and they shall be fully operational before the site is brought into use. - Drainage Plan, 13664-077-33-A - Surface Water Strategy Report (Marks Heeley Ltd, ref. H16601), April 2023 - Finishes Plan, 13664-077-46 Facts

Contents

{
        "entry-date": "2025-03-20",
        "start-date": "",
        "end-date": "",
        "entity": 73001261,
        "name": "Surface water via interceptor (amended)",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0113229",
        "prefix": "planning-condition",
        "organisation-entity": "109",
        "geometry": "",
        "point": "",
        "quality": "",
        "notes": "Unique Condition",
        "reason": "To avoid pollution of the public sewer and land drainage system.",
        "description": "All surface water run off from the site, excepting roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor. These arrangements shall be implemented according to details listed below and as approved by the Local Planning Authority under reference 23/00523/COND and they shall be fully operational before the site is brought into use. - Drainage Plan, 13664-077-33-A - Surface Water Strategy Report (Marks Heeley Ltd, ref. H16601), April 2023 - Finishes Plan, 13664-077-46"
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.