Planning condition
EA condition
| Field | Value | Fact links |
|---|---|---|
| CURIE | planning-condition:U0113338 | no fact link |
| Prefix | planning-condition | Facts |
| Reference | U0113338 | Facts |
| Name | EA condition | Facts |
| Quality | We have no data | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts | |
| End date | Facts | |
| Entry date | 2025-03-20 | Facts |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts |
| Reason | To reduce the risk of flooding to the proposed development and to prevent flooding elsewhere by minimising the risk of blockage as a result of the bridge. | Facts |
| Description | The development shall be carried out in accordance with the details referenced within the email from Peter Andrew to Roy Sykes (ref: Temporary Bridge, Evergreen, dated 9th August 2023) and the following mitigation measure shall be included: + The soffit level of the bridge shall be set no lower than 2.18 metres above Ordnance Datum, which provides a 1.00 metre freeboard above the design flood height. + The measure detailed above shall be retained and maintained thereafter throughout the lifetime of the development. | Facts |
Contents
{
"entry-date": "2025-03-20",
"start-date": "",
"end-date": "",
"entity": 73001319,
"name": "EA condition",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0113338",
"prefix": "planning-condition",
"organisation-entity": "109",
"geometry": "",
"point": "",
"quality": "",
"notes": "Unique Condition",
"reason": "To reduce the risk of flooding to the proposed development and to prevent flooding elsewhere by minimising the risk of blockage as a result of the bridge.",
"description": "The development shall be carried out in accordance with the details referenced within the email from Peter Andrew to Roy Sykes (ref: Temporary Bridge, Evergreen, dated 9th August 2023) and the following mitigation measure shall be included: + The soffit level of the bridge shall be set no lower than 2.18 metres above Ordnance Datum, which provides a 1.00 metre freeboard above the design flood height. + The measure detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.