Skip to main content

This is a new service - your feedback will help us to improve it.

Planning condition

FRA Compliance

Field Value Fact links
CURIE planning-condition:U0113568 no fact link
Prefix planning-condition Facts
Reference U0113568 Facts
Name FRA Compliance Facts
Quality We have no data no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts
End date Facts
Entry date 2025-03-20 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason To reduce the risk of flooding to the proposed development and elsewhere by ensuring that flood storage and flows are not impeded. Facts
Description The development shall be carried out in accordance with the submitted flood risk assessment by Alan Wood and Partners referenced JAG/AD/JR/49495-Rp001 and dated 2 August 2023, and the following mitigation measures it details: - Finished floor levels shall be set no lower than 2.66 meters Above Ordnance Datum (mAOD) as set detailed within section 7.2.5 of the FRA. - The shed shall be of an open construction and have an open-door policy to allow flood waters to pass though unheeded as set out in paragraphs 7.3.1 - 7.3.3 of the FRA. - Electrical or other flood sensitive equipment shall be elevated to 4.40 mAOD or above as detailed in paragraph 7.3.5 of the FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. Facts

Contents

{
        "entry-date": "2025-03-20",
        "start-date": "",
        "end-date": "",
        "entity": 73001390,
        "name": "FRA Compliance",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0113568",
        "prefix": "planning-condition",
        "organisation-entity": "109",
        "geometry": "",
        "point": "",
        "quality": "",
        "notes": "Unique Condition",
        "reason": "To reduce the risk of flooding to the proposed development and elsewhere by ensuring that flood storage and flows are not impeded.",
        "description": "The development shall be carried out in accordance with the submitted flood risk assessment by Alan Wood and Partners referenced JAG/AD/JR/49495-Rp001 and dated 2 August 2023, and the following mitigation measures it details: - Finished floor levels shall be set no lower than 2.66 meters Above Ordnance Datum (mAOD) as set detailed within section 7.2.5 of the FRA. - The shed shall be of an open construction and have an open-door policy to allow flood waters to pass though unheeded as set out in paragraphs 7.3.1 - 7.3.3 of the FRA. - Electrical or other flood sensitive equipment shall be elevated to 4.40 mAOD or above as detailed in paragraph 7.3.5 of the FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.