Planning condition
FRA
| Field | Value | Fact links |
|---|---|---|
| CURIE | planning-condition:U0114012 | no fact link |
| Prefix | planning-condition | Facts |
| Reference | U0114012 | Facts |
| Name | FRA | Facts |
| Quality | We have no data | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts | |
| End date | Facts | |
| Entry date | 2025-03-20 | Facts |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts |
| Reason | To reduce the risk of flooding to the proposed development and future occupants as required by Policy 57 of the Doncaster Local Plan. | Facts |
| Description | The development shall be carried out in accordance with the submitted flood risk assessment (ref October 2021 / JBA Consulting / GGI-JBAU-XX-XX-RP-EN-0001.S1.P04 - Wheatley Park FRA) and the following mitigation measures it details: o Finished floor levels shall be set no lower than 10.11metres above Ordnance Datum (AOD) These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. | Facts |
Contents
{
"entry-date": "2025-03-20",
"start-date": "",
"end-date": "",
"entity": 73001463,
"name": "FRA",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0114012",
"prefix": "planning-condition",
"organisation-entity": "109",
"geometry": "",
"point": "",
"quality": "",
"notes": "Unique Condition",
"reason": "To reduce the risk of flooding to the proposed development and future occupants as required by Policy 57 of the Doncaster Local Plan.",
"description": "The development shall be carried out in accordance with the submitted flood risk assessment (ref October 2021 / JBA Consulting / GGI-JBAU-XX-XX-RP-EN-0001.S1.P04 - Wheatley Park FRA) and the following mitigation measures it details: o Finished floor levels shall be set no lower than 10.11metres above Ordnance Datum (AOD) These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.