Planning condition
THE MAIN ROOF
| Field | Value | Fact links |
|---|---|---|
| CURIE | planning-condition:U0114771 | no fact link |
| Prefix | planning-condition | Facts |
| Reference | U0114771 | Facts |
| Name | THE MAIN ROOF | Facts |
| Quality | We have no data | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts | |
| End date | Facts | |
| Entry date | 2025-03-20 | Facts |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts |
| Reason | To preserve historic character and fabric of the listed building., in accordance with policy 36 of the Local Plan. | Facts |
| Description | Prior to the removal of the roof covering, a method statement shall be submitted that details the removal and storage of the tiles, details of the tile fixings along with photographic evidence and as samples available for inspection. This initial method statement should also explain how the building and internal fabric will be protected from the weather elements. Following the exposure of the roof frame, a condition report shall be submitted, setting out the method required for the work to be undertaken to the frame and the reinstatement of the roof covering. This should also include repairs to timbers, new sections of timber, any strengthening of existing timber and other associated matters to include insulation. | Facts |
Contents
{
"entry-date": "2025-03-20",
"start-date": "",
"end-date": "",
"entity": 73001605,
"name": "THE MAIN ROOF",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0114771",
"prefix": "planning-condition",
"organisation-entity": "109",
"geometry": "",
"point": "",
"quality": "",
"notes": "Unique Condition",
"reason": "To preserve historic character and fabric of the listed building., in accordance with policy 36 of the Local Plan.",
"description": "Prior to the removal of the roof covering, a method statement shall be submitted that details the removal and storage of the tiles, details of the tile fixings along with photographic evidence and as samples available for inspection. This initial method statement should also explain how the building and internal fabric will be protected from the weather elements. Following the exposure of the roof frame, a condition report shall be submitted, setting out the method required for the work to be undertaken to the frame and the reinstatement of the roof covering. This should also include repairs to timbers, new sections of timber, any strengthening of existing timber and other associated matters to include insulation."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.