EA

Field Value Fact links
CURIE planning-condition:U0117043 no fact link
Prefix planning-condition Facts
Reference U0117043 Facts
Name EA Facts
Quality We have no data no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts
End date Facts
Entry date 2025-06-24 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason To reduce the risk of flooding to the proposed development and future occupants Facts
Description The development shall be carried out in accordance with the submitted flood risk assessment (ref September 2023 / GridServe / LCO-JBAU-XX-XX-RP-Z-0001) and the following mitigation measures it details: o The concrete foundation which holds the sub-station and charging infrastructure, shall be set no lower than 150mm above the surrounding ground levels o The electrical cabling and substation hardware should be set at a height of 150mm above the surrounding ground level These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. Facts

Contents

{
        "entry-date": "2025-06-24",
        "start-date": "",
        "end-date": "",
        "entity": 73002100,
        "name": "EA",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0117043",
        "prefix": "planning-condition",
        "organisation-entity": "109",
        "geometry": "",
        "point": "",
        "quality": "",
        "notes": "Unique Condition",
        "reason": "To reduce the risk of flooding to the proposed development and future occupants",
        "description": "The development shall be carried out in accordance with the submitted flood risk assessment (ref September 2023 / GridServe / LCO-JBAU-XX-XX-RP-Z-0001) and the following mitigation measures it details: o The concrete foundation which holds the sub-station and charging infrastructure, shall be set no lower than 150mm above the surrounding ground levels o The electrical cabling and substation hardware should be set at a height of 150mm above the surrounding ground level These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.