Planning condition
EA
| Field | Value | Fact links |
|---|---|---|
| CURIE | planning-condition:U0117043 | no fact link |
| Prefix | planning-condition | Facts |
| Reference | U0117043 | Facts |
| Name | EA | Facts |
| Quality | We have no data | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts | |
| End date | Facts | |
| Entry date | 2025-06-24 | Facts |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts |
| Reason | To reduce the risk of flooding to the proposed development and future occupants | Facts |
| Description | The development shall be carried out in accordance with the submitted flood risk assessment (ref September 2023 / GridServe / LCO-JBAU-XX-XX-RP-Z-0001) and the following mitigation measures it details: o The concrete foundation which holds the sub-station and charging infrastructure, shall be set no lower than 150mm above the surrounding ground levels o The electrical cabling and substation hardware should be set at a height of 150mm above the surrounding ground level These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. | Facts |
Contents
{
"entry-date": "2025-06-24",
"start-date": "",
"end-date": "",
"entity": 73002100,
"name": "EA",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0117043",
"prefix": "planning-condition",
"organisation-entity": "109",
"geometry": "",
"point": "",
"quality": "",
"notes": "Unique Condition",
"reason": "To reduce the risk of flooding to the proposed development and future occupants",
"description": "The development shall be carried out in accordance with the submitted flood risk assessment (ref September 2023 / GridServe / LCO-JBAU-XX-XX-RP-Z-0001) and the following mitigation measures it details: o The concrete foundation which holds the sub-station and charging infrastructure, shall be set no lower than 150mm above the surrounding ground levels o The electrical cabling and substation hardware should be set at a height of 150mm above the surrounding ground level These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.