Planning condition
CMP Highways
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0123208 | no fact link |
| Prefix | planning-condition | Facts about Prefix |
| Reference | U0123208 | Facts about Reference |
| Name | CMP Highways | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts about Start date | |
| End date | Facts about End date | |
| Entry date | 2025-06-24 | Facts about Entry date |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts about Notes |
| Reason | In the interests of protecting residential amenity from noise and disturbance and to ensure the safe operation of the highway for the duration of the construction phase of the development as required by Policy 42 A.2 of the Doncaster Local Plan. This condition is required to be discharged prior to commencement as the approved detail may have an impact on construction arrangements. | Facts about Reason |
| Description | Prior to commencement of development in any part of the site the Planning Authority shall have received and approved a Construction Management Plan (CMP) including: (a) the timetable of the works; (b) daily hours of construction; (c) any road closure; (d) hours during which delivery and construction traffic will travel to and from the site, with such vehicular movements being restricted to between 8:00am and 6pm Mondays to Fridays inc.; 9.00am to 1.00pm Saturdays, and no such vehicular movements taking place on Sundays and Bank/Public Holidays unless agreed by the planning Authority in advance; (e) the number and sizes of vehicles visiting the site in connection with the development and the frequency of their visits; (f) the compound/location where all building materials, finished or unfinished products, parts, crates, packing materials and waste will be stored during the demolition and construction phases; (g) areas on-site where delivery vehicles and construction traffic will load or unload building materials, finished or unfinished products, parts, crates, packing materials and waste with confirmation that no construction traffic or delivery vehicles will park on the highway for loading or unloading purposes, unless prior written agreement has been given by the Local Planning Authority; (h) hours during which no construction traffic will be present at the site; (i) the means of enclosure of the site during construction works; (j) details of proposals to promote car sharing amongst construction staff in order to limit construction staff vehicles parking off-site; (k) details of wheel washing facilities and obligations; (l) The proposed route of all construction traffic exceeding 7.5 tonnes; (m) Details of the amount and location of construction worker parking; (n) Photographic evidence of the condition of adjacent public highway prior to commencement of any work; (o) no mud, stones, water or debris shall be deposited on the public highway at any time. The development shall be constructed in accordance with the approved CMP. | Facts about Description |
Contents
{
"entry-date": "2025-06-24",
"start-date": "",
"end-date": "",
"entity": 73009487,
"name": "CMP Highways",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0123208",
"prefix": "planning-condition",
"organisation-entity": 109,
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "In the interests of protecting residential amenity from noise and disturbance and to ensure the safe operation of the highway for the duration of the construction phase of the development as required by Policy 42 A.2 of the Doncaster Local Plan. This condition is required to be discharged prior to commencement as the approved detail may have an impact on construction arrangements.",
"description": "Prior to commencement of development in any part of the site the Planning Authority shall have received and approved a Construction Management Plan (CMP) including: (a) the timetable of the works; (b) daily hours of construction; (c) any road closure; (d) hours during which delivery and construction traffic will travel to and from the site, with such vehicular movements being restricted to between 8:00am and 6pm Mondays to Fridays inc.; 9.00am to 1.00pm Saturdays, and no such vehicular movements taking place on Sundays and Bank/Public Holidays unless agreed by the planning Authority in advance; (e) the number and sizes of vehicles visiting the site in connection with the development and the frequency of their visits; (f) the compound/location where all building materials, finished or unfinished products, parts, crates, packing materials and waste will be stored during the demolition and construction phases; (g) areas on-site where delivery vehicles and construction traffic will load or unload building materials, finished or unfinished products, parts, crates, packing materials and waste with confirmation that no construction traffic or delivery vehicles will park on the highway for loading or unloading purposes, unless prior written agreement has been given by the Local Planning Authority; (h) hours during which no construction traffic will be present at the site; (i) the means of enclosure of the site during construction works; (j) details of proposals to promote car sharing amongst construction staff in order to limit construction staff vehicles parking off-site; (k) details of wheel washing facilities and obligations; (l) The proposed route of all construction traffic exceeding 7.5 tonnes; (m) Details of the amount and location of construction worker parking; (n) Photographic evidence of the condition of adjacent public highway prior to commencement of any work; (o) no mud, stones, water or debris shall be deposited on the public highway at any time. The development shall be constructed in accordance with the approved CMP."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.