SHLAA0180

Provenance

Filters

Field

1 selected
Field
Clear

6 results

Fields:

Fact Field Value Latest Entry Date
37270f695e1054a6b574732aff82a1356db2b7b93d3de8d764398dc2d5d6478d notes CPP2 SSA4 Allocation (Southern site) | BH2019/03548 | Development completed in 2024/25. 2025-12-01
3d8174d96d5b4c8091abb6624e6a683071783785d76a8fa650d307c63b0e681f notes BH2019/03548 Approved Aug 2020. PPA Signed April 2017. Pre App discussions. The previous use of the proposed development site as a railway yard and industrial site presents a high risk of contamination that could be mobilised during construction to pollute controlled waters. The east and south sides of the site has some history of contaminative use and this is referenced in the RSK land contamination report of 4/8/17. 2020-12-21
8a460fb65f2629c8a7398dce901803659ce7a98a53293a63db9822fe7476786f notes PPA Signed April 2017 2017-12-18
9465d8177c22873524d6ecf3231eb8ecf5289dfc71fb4eaff170e8cefca7063b notes PPA Signed April 2017. Pre App discussions. The previous use of the proposed development site as a railway yard and industrial site presents a high risk of contamination that could be mobilised during construction to pollute controlled waters. The east and south sides of the site has some history of contaminative use and this is referenced in the RSK land contamination report of 4/8/17. 2019-12-16
b967a5fb9975fa6bd987a81b1736eae978204d31a8507c74eff5ed0864c8ec98 notes PPA Signed April 2017. Pre App discussions. 2018-10-26
bf36ceff2762385337f1920a10415c920906f46f3e3517d572daeb2b33c74c5d notes BH2019/03548 Approved Aug 2020 commenced summer 2021. PPA Signed April 2017. Pre App discussions. The previous use of the proposed development site as a railway yard and industrial site presents a high risk of contamination that could be mobilised during construction to pollute controlled waters. The east and south sides of the site has some history of contaminative use and this is referenced in the RSK land contamination report of 4/8/17. 2022-12-05