Floor Levels - EA
Provenance

Filters

Field

1 selected

Field

Clear

1 result

Fact Field Value Latest Entry Date
ad83c6ba7a62131141dcb4142ca35a93b41e62deeca69171d3bb348397e046c0 description The development shall be carried out in accordance with the submitted flood risk assessment (ref 11 May 2020 / FRA Addendum / ARK Environmental) and the following mitigation measures it details: o Finished floor levels shall be set no lower than 6.38m above Ordnance Datum (AOD). These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. 2025-03-20