Fact Field Value Latest Entry Date
779a88e413390000d6b61dbd540ea0ff58fe6105ed7699c88d743f424d8f68ee description All surface water run off from the site, excepting roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor. These arrangements shall be implemented according to details listed below and as approved by the Local Planning Authority under reference 23/00523/COND and they shall be fully operational before the site is brought into use. - Drainage Plan, 13664-077-33-A - Surface Water Strategy Report (Marks Heeley Ltd, ref. H16601), April 2023 - Finishes Plan, 13664-077-46 2025-03-20