EA condition
Provenance
1 result
Fields:
description
| Fact | Field | Value | Latest Entry Date | |
|---|---|---|---|---|
| 8fac9b9c3987b99aea4d9154f078b0e304192346b31b0f848fac82248fd605fd | description | The development shall be carried out in accordance with the details referenced within the email from Peter Andrew to Roy Sykes (ref: Temporary Bridge, Evergreen, dated 9th August 2023) and the following mitigation measure shall be included: + The soffit level of the bridge shall be set no lower than 2.18 metres above Ordnance Datum, which provides a 1.00 metre freeboard above the design flood height. + The measure detailed above shall be retained and maintained thereafter throughout the lifetime of the development. | 2025-03-20 |