Filters

Field

1 selected

Field

Clear

1 result

Fact Field Value Latest Entry Date
2d1d59f4937873a5809e0a1d96c1f1d79fb480f2bc0998f0eac73a2d34294690 description Prior to the occupation of the site, a Phase 4 verification report shall be submitted to and approved in writing by the Local Planning Authority (LPA). The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA. 2025-03-20