Filters

Field

1 selected

Field

Clear

1 result

Fact Field Value Latest Entry Date
9d663624a4992d986df253e1a264cfd53791d6fb5b2da70f1a5171de29d4c056 description Within 30 days of planning permission being granted, details of an extraction/ventilation system to control the emission of odours and fumes from the nail bar so as to prevent any odour disamenity to nearby residents shall be submitted to the local planning authority in writing, for approval. The approved scheme shall be installed and be fully operational within 30 days of approval. All equipment installed as part of the scheme shall thereafter be operated and maintained in accordance with the manufacturer's instructions. The system shall be so designed as to ensure that noise from its operation does not cause adverse impact to nearby residents. 2025-03-20