THE MAIN ROOF
Provenance
1 result
Fields:
description
| Fact | Field | Value | Latest Entry Date | |
|---|---|---|---|---|
| 3cefa986987ba6b85aeec385b0ce7c500757ffb63b44d93099809d60c04cbaa5 | description | Prior to the removal of the roof covering, a method statement shall be submitted that details the removal and storage of the tiles, details of the tile fixings along with photographic evidence and as samples available for inspection. This initial method statement should also explain how the building and internal fabric will be protected from the weather elements. Following the exposure of the roof frame, a condition report shall be submitted, setting out the method required for the work to be undertaken to the frame and the reinstatement of the roof covering. This should also include repairs to timbers, new sections of timber, any strengthening of existing timber and other associated matters to include insulation. | 2025-03-20 |