Skip to main content

This is a new service - your feedback will help us to improve it.

Planning condition

FRA

Field Value Fact links
CURIE planning-condition:U0112762 no fact link
Prefix planning-condition Facts
Reference U0112762 Facts
Name FRA Facts
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts
End date Facts
Entry date 2025-03-20 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason To ensure flood risk is minimised on the site without increasing risk elsewhere. Facts
Description The development permitted by this planning permission shall be carried out in accordance with the approved flood risk assessment (FRA) produced by J Roberts Design Ltd Structural and Engineering Consultants (Reference 3225 Rev A / Aug 2023) and the following mitigation measures detailed within the FRA: - The site is signed up for flood warnings with the EA flood warning scheme. The mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing / phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the local planning authority. Facts

Contents

{
        "curie": "planning-condition:U0112762",
        "prefix": "planning-condition",
        "reference": "U0112762",
        "name": "FRA",
        "dataset": "planning-condition",
        "organisation-entity": "local-authority:DNC",
        "start-date": "",
        "end-date": "",
        "entry-date": "2025-03-20",
        "typology": "policy",
        "geometry": "",
        "point": "",
        "entity": 73001173,
        "quality": "",
        "notes": "Unique Condition",
        "reason": "To ensure flood risk is minimised on the site without increasing risk elsewhere.",
        "description": "The development permitted by this planning permission shall be carried out in accordance with the approved flood risk assessment (FRA) produced by J Roberts Design Ltd Structural and Engineering Consultants (Reference 3225 Rev A / Aug 2023) and the following mitigation measures detailed within the FRA: - The site is signed up for flood warnings with the EA flood warning scheme. The mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing / phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the local planning authority."
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.