Planning condition

FRA Compliance

Field Value Fact links
CURIE planning-condition:U0114605 no fact link
Prefix planning-condition Facts
Reference U0114605 Facts
Name FRA Compliance Facts
Quality We have no data no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts
End date Facts
Entry date 2025-03-20 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason To reduce the risk of flooding to the proposed development and future occupants and to ensure the development is appropriately flood resistant and resilient such that, in the event of a flood, it could be quickly brought back into use without significant refurbishment. Facts
Description The development shall be carried out in accordance with the submitted flood risk statement compiled by Building Link Design Architects (13/09/23) and the following mitigation measures it details: - Finished Floor levels of the ground floor will be no lower than 2.88 meters above Ordinance Datum (mAOD); - There shall be no sleeping accommodation located on the ground floor of the development; - Flood resilience measures will be incorporated up to a minimum of 4.4 mAOD; and - Electrical sockets will be raised to a minimum of 4.4 mAOD. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. Facts

Contents

{
        "entry-date": "2025-03-20",
        "start-date": "",
        "end-date": "",
        "entity": 73001574,
        "name": "FRA Compliance",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0114605",
        "prefix": "planning-condition",
        "organisation-entity": "109",
        "geometry": "",
        "point": "",
        "quality": "",
        "notes": "Unique Condition",
        "reason": "To reduce the risk of flooding to the proposed development and future occupants and to ensure the development is appropriately flood resistant and resilient such that, in the event of a flood, it could be quickly brought back into use without significant refurbishment.",
        "description": "The development shall be carried out in accordance with the submitted flood risk statement compiled by Building Link Design Architects (13/09/23) and the following mitigation measures it details: - Finished Floor levels of the ground floor will be no lower than 2.88 meters above Ordinance Datum (mAOD); - There shall be no sleeping accommodation located on the ground floor of the development; - Flood resilience measures will be incorporated up to a minimum of 4.4 mAOD; and - Electrical sockets will be raised to a minimum of 4.4 mAOD. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.