Planning condition
Flood risk
| Field | Value | Fact links |
|---|---|---|
| CURIE | planning-condition:U0116046 | no fact link |
| Prefix | planning-condition | Facts |
| Reference | U0116046 | Facts |
| Name | Flood risk | Facts |
| Quality | We have no data | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts | |
| End date | Facts | |
| Entry date | 2025-03-20 | Facts |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts |
| Reason | o To reduce the risk of flooding to the proposed development and future occupants | Facts |
| Description | The development shall be carried out in accordance with the submitted flood risk assessment (ref Flood Risk Assessment Report / rec'd July 2023) and the following mitigation measures it details: o Finished floor levels shall be set no lower than existing levels at ground and upper floors, as per Pg11: Recommendations of the FRA o More vulnerable (residential) development will be limited to the first floor and above, as per Pg11: Recommendations of the FRA o Flood resilience and resistance measures shall be included as per Pg11: Recommendations of the FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. | Facts |
Contents
{
"entry-date": "2025-03-20",
"start-date": "",
"end-date": "",
"entity": 73001894,
"name": "Flood risk",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0116046",
"prefix": "planning-condition",
"organisation-entity": "109",
"geometry": "",
"point": "",
"quality": "",
"notes": "Unique Condition",
"reason": "o To reduce the risk of flooding to the proposed development and future occupants",
"description": "The development shall be carried out in accordance with the submitted flood risk assessment (ref Flood Risk Assessment Report / rec'd July 2023) and the following mitigation measures it details: o Finished floor levels shall be set no lower than existing levels at ground and upper floors, as per Pg11: Recommendations of the FRA o More vulnerable (residential) development will be limited to the first floor and above, as per Pg11: Recommendations of the FRA o Flood resilience and resistance measures shall be included as per Pg11: Recommendations of the FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.