Planning condition
Drainage - Precom
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0121858 | no fact link |
| Prefix | planning-condition | Facts about Prefix |
| Reference | U0121858 | Facts about Reference |
| Name | Drainage - Precom | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts about Start date | |
| End date | Facts about End date | |
| Entry date | 2025-06-24 | Facts about Entry date |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts about Notes |
| Reason | To ensure that the site is connected to suitable drainage systems as required by Policy 56 of the Local Plan. The details are required at this stage to ensure that full details thereof are approved by the Local Planning Authority before any works begin. | Facts about Reason |
| Description | The development hereby permitted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the relevant part of the drainage system that serves those plots shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the of those plots. If discharge to public sewer is proposed, the information shall include: a) evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical; c) the means of restricting the discharge to public sewer to the a rate not to exceed 2 litres per second. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development. | Facts about Description |
Contents
{
"entry-date": "2025-06-24",
"start-date": "",
"end-date": "",
"entity": 73009205,
"name": "Drainage - Precom",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0121858",
"prefix": "planning-condition",
"organisation-entity": 109,
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "To ensure that the site is connected to suitable drainage systems as required by Policy 56 of the Local Plan. The details are required at this stage to ensure that full details thereof are approved by the Local Planning Authority before any works begin.",
"description": "The development hereby permitted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the relevant part of the drainage system that serves those plots shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the of those plots. If discharge to public sewer is proposed, the information shall include: a) evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical; c) the means of restricting the discharge to public sewer to the a rate not to exceed 2 litres per second. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.