Planning condition
FRA Compliance
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0120860 | no fact link |
| Prefix | planning-condition | Facts about Prefix |
| Reference | U0120860 | Facts about Reference |
| Name | FRA Compliance | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts about Start date | |
| End date | Facts about End date | |
| Entry date | 2025-06-24 | Facts about Entry date |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts about Notes |
| Reason | To ensure water sensitive infrastructure remains operational during flood events. | Facts about Reason |
| Description | The development shall be carried out in accordance with the submitted flood risk assessment compiled by RAB Consultants, referenced 3074, Version 1.0 dated 21/12/2022, and the following mitigation measures it details: - All water sensitive infrastructure shall be set above the Isle of Axholme critical flood level plus 300mm of freeboard (4.4 metres above Ordnance Datum) These mitigation measures shall be fully implemented and maintained thereafter throughout the lifetime of the development. | Facts about Description |
Contents
{
"entry-date": "2025-06-24",
"start-date": "",
"end-date": "",
"entity": 73009040,
"name": "FRA Compliance",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0120860",
"prefix": "planning-condition",
"organisation-entity": 109,
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "To ensure water sensitive infrastructure remains operational during flood events.",
"description": "The development shall be carried out in accordance with the submitted flood risk assessment compiled by RAB Consultants, referenced 3074, Version 1.0 dated 21/12/2022, and the following mitigation measures it details: - All water sensitive infrastructure shall be set above the Isle of Axholme critical flood level plus 300mm of freeboard (4.4 metres above Ordnance Datum) These mitigation measures shall be fully implemented and maintained thereafter throughout the lifetime of the development."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.