Planning condition
Construction Traffic Management Plan
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0120981 | no fact link |
| Prefix | planning-condition | Facts about Prefix |
| Reference | U0120981 | Facts about Reference |
| Name | Construction Traffic Management Plan | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts about Start date | |
| End date | Facts about End date | |
| Entry date | 2025-06-24 | Facts about Entry date |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts about Notes |
| Reason | To safeguard the living conditions of neighbouring residents and in the interests of highway safety | Facts about Reason |
| Description | No construction works shall take place until full details of offsite highway works have been submitted to and agreed in writing by the Local Planning authority within a Construction Traffic Management Plan. The development shall be carried out in accordance with the agreed details and cover the following points, expanded on as required: - Volumes and types of construction vehicles - identification of delivery routes; - identification of agreed access point - Contractors method for controlling construction traffic and adherence to routes - Size, route and numbers of abnormal loads - Swept path analysis (as required) - Construction Period - Temporary signage - Wheel Wash facilities - Timing of deliveries | Facts about Description |
Contents
{
"entry-date": "2025-06-24",
"start-date": "",
"end-date": "",
"entity": 73009047,
"name": "Construction Traffic Management Plan",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0120981",
"prefix": "planning-condition",
"organisation-entity": 109,
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "To safeguard the living conditions of neighbouring residents and in the interests of highway safety",
"description": "No construction works shall take place until full details of offsite highway works have been submitted to and agreed in writing by the Local Planning authority within a Construction Traffic Management Plan. The development shall be carried out in accordance with the agreed details and cover the following points, expanded on as required: - Volumes and types of construction vehicles - identification of delivery routes; - identification of agreed access point - Contractors method for controlling construction traffic and adherence to routes - Size, route and numbers of abnormal loads - Swept path analysis (as required) - Construction Period - Temporary signage - Wheel Wash facilities - Timing of deliveries"
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.