FRA
Provenance
1 result
Fields:
description
| Fact | Field | Value | Latest Entry Date | |
|---|---|---|---|---|
| de2de602c870b0a9474b54076db401cb552bf7ac7939a50a3b78fda862c7358e | description | The development permitted by this planning permission shall be carried out in accordance with the approved flood risk assessment (FRA) produced by J Roberts Design Ltd Structural and Engineering Consultants (Reference 3225 Rev A / Aug 2023) and the following mitigation measures detailed within the FRA: - The site is signed up for flood warnings with the EA flood warning scheme. The mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing / phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the local planning authority. | 2025-03-20 |