Planning condition

FRA

About this entity

Fact links
CURIE planning-condition:U0121404 no fact link
Prefix planning-condition Facts about Prefix
Reference U0121404 Facts about Reference
Name FRA Facts about Name
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts about Start date
End date Facts about End date
Entry date 2025-06-24 Facts about Entry date
Typology policy no fact link
Notes Unique Condition Facts about Notes
Reason 1. To prevent flooding impacting on the works. 2. To prevent an increase in flood risk elsewhere. 3. To prevent an increase in surface water runoff from the site. 4. To protect the banks of the River Torne. 5. To prevent an increase in flood risk elsewhere. Facts about Reason
Description The development permitted by this planning permission shall be carried out in accordance with the approved flood risk assessment (FRA) and the following mitigation measures detailed within the FRA: 1. Machinery and plant to be stored to the north of the site in flood zone 1. 2. There should be no raising of ground levels, either permanently or temporarily in flood zones 2 or 3. 3. There should be no inclusion of impermeable surfacing of the site. 4. There should be no excavation within 8 metres from the top of bank of the River Torne, a designated 'main river'. 5. Finished ground levels to be no greater than existing ground levels. The mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing/phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the Local Planning Authority. Facts about Description

Contents

{
        "entry-date": "2025-06-24",
        "start-date": "",
        "end-date": "",
        "entity": 73009124,
        "name": "FRA",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0121404",
        "prefix": "planning-condition",
        "organisation-entity": 109,
        "geometry": "",
        "point": "",
        "quality": "authoritative",
        "notes": "Unique Condition",
        "reason": "1. To prevent flooding impacting on the works. 2. To prevent an increase in flood risk elsewhere. 3. To prevent an increase in surface water runoff from the site. 4. To protect the banks of the River Torne. 5. To prevent an increase in flood risk elsewhere.",
        "description": "The development permitted by this planning permission shall be carried out in accordance with the approved flood risk assessment (FRA) and the following mitigation measures detailed within the FRA: 1. Machinery and plant to be stored to the north of the site in flood zone 1. 2. There should be no raising of ground levels, either permanently or temporarily in flood zones 2 or 3. 3. There should be no inclusion of impermeable surfacing of the site. 4. There should be no excavation within 8 metres from the top of bank of the River Torne, a designated 'main river'. 5. Finished ground levels to be no greater than existing ground levels. The mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing/phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the Local Planning Authority."
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.